Construction Timeline
Delivery and preparation of the bungalows for Buckley Village will begin in November 2009 to prepare for students and faculty to move into these temporary spaces in the spring of 2010. This will allow the existing buildings to be demolished in spring 2010 and the primary construction of the Main Academic Center to begin in summer 2010 and continue through December 2011. Depending on weather and other delays, we will move into the new buildings sometime between January 2012 and June 2012.
At the completion of Phase 1, the Library will be temporarily located in renovated space on the top level of The Quinn Martin building. Phase 2 completes the final move for the Library into the new Library and Technology Center which will also house much needed campus storage.
The disruption to campus during building Phase 2 and 3 is far less because permanent classrooms will be fully operational. There will be no need for temporary classroom during these phases. Upon completing Phase 1 construction we will turn our attention to the details and plans for operating during these subsequent phases.